BEVERLY, Wash. (AP) — A contractor is erecting a platform on Wanapum Dam for drilling to explore the size of the crack that was discovered Feb. 27 in a spillway pier.

While the Grant County Public Utility District decides on a repair plan, the reservoir behind the dam near Vantage remains lowered to reduce pressure.

Sign up for our Top Stories newsletter

Recommended for you