Advertisement

Posted: Friday, November 13, 2009 12:00 AM




Advertisement




Columbia shutdown could add to jam

By the Capital Press

Pressure to move wheat through Portland next fall could be greater than most years, given that barge transportation on the Columbia River system is expected to be shut down from December 2010 to April 2011.

The U.S. Army Corps of Engineers plans to repair locks at The Dalles and John Day dams on the Columbia and the Lower Monumental Dam on the Snake River during that period.

"My guess is people will want to get everything down (river) before then," said Oregon Wheat Commissioner Tom Duyck. "That will make a jam."

The Port of Portland is working with railroads to establish a rail link to its Terminal Six during the shutdown, said Josh Thomas, a spokesman for the Port of Portland.

--Mitch Lies

Comments made about this article

Comment on this article

You must LOGIN to post comments

Advertisement

Copyright © 2009-2012 Capital Press, MediaSpan and The Associated Press where indicated. All rights reserved.

Contact Capital Press at 1-800-882-6789 or click here to find our staff listing.

Site optimized for use with Firefox browser, Ver. 8.0

Privacy Policies: Capital Press | MediaSpan Online Services

Other Capital Press websites:

Capital Press | OnlyAg.com | Ag Ads Now | Farm Seller | Ag Directory West | Blogriculture agriculture blog and podcasts | Capital Press Digital Marketing Services

Our sister East Oregonian Publishing Co. websites:

The Daily Astorian | Coast Weekend | AstoriaRocks.com | Chinook Observer
| Seaside-Sun.com| Hermiston Herald | East Oregonian |
Eastern Oregon Real Estate | EO Marketplace | Blue Mountain Eagle | Wallowa County Chieftain