Advertisement

Posted: Wednesday, November 14, 2012 1:44 PM




Advertisement




BPA selects route for SW Washington power line

LONGVIEW, Wash. (AP) -- The Bonneville Power Administration has selected a preferred route for a 79-mile high-voltage transmission line between Castle Rock and Troutdale, Ore.

The preferred route runs mostly through Weyerhaeuser and state-owned timberlands.

The Daily News reports (http://is.gd/dQIZRW ) some landowners wanted the power line to run through more remote areas farther east.

The public can comment on the preferred route and three other options listed in an impact study released Tuesday. Six meetings are planned before the end of the year. The first will be Dec. 4 at Castle Rock Elementary School.

The BPA plans to make a decision on the $459 million project by the end of 2014. The agency hopes the 500-kilovolt line will be operating by 2018 to help meet the demand for electricity in the region.

___

Information from: The Daily News, http://www.tdn.com

Copyright 2012 The AP.

Comments made about this article

Comment on this article

You must LOGIN to post comments

Advertisement

Copyright © 2009-2013 Capital Press, MediaSpan and The Associated Press where indicated. All rights reserved.

Contact Capital Press at 1-800-882-6789 or click here to find our staff listing.

Site optimized for use with Firefox browser, Ver. 16.0.1

Privacy Policies: Capital Press | MediaSpan Online Services

Other Capital Press websites:

Capital Press | OnlyAg.com | Ag Ads Now | Farm Seller | Ag Directory West | Blogriculture agriculture blog and podcasts

Our sister EO Media Group websites:

The Daily Astorian | Coast Weekend | AstoriaRocks.com | Chinook Observer
Oregon Coast Today | Seaside-Sun.com| Seaside Signal| Cannon Beach Gazette
Coast River Business Journal
Hermiston Herald | East Oregonian | Eastern Oregon Real Estate | EO Marketplace
Blue Mountain Eagle | Wallowa County Chieftain